Free Kitchen Fitters job checklist
A pre-job, on-site, and post-job checklist for UK kitchen-fitting work. Multi-day projects with multiple trades; the survey + ordering rows are critical because they prevent most of the on-site surprises that derail a fit.
What's in the checklist
- Survey + ordering (week before fit) — 5 items
- Day 1: strip-out — 5 items
- Fit-out (days 2-4 typically) — 5 items
- Final fit + handover — 7 items
Printed on A4. Designed to be ticked off as you go and signed at the bottom by the customer for handover-pack inclusion.
Get the PDF
Drop your email and the download starts immediately. We'll also keep you in the loop on new CMA templates and tools.
Get CMA updates
Tips, product updates, and practical ideas for tradespeople.
© 2026 Use CMA. All rights reserved.
Made by David Wright at Coder Studios