Free 建築業者 job checklist
A pre-job, on-site, and post-job checklist for UK building work. Built for multi-day projects (extensions, loft conversions, structural alterations); print one per stage and keep with the project file.
What's in the checklist
- Pre-start (before any work begins) — 5 items
- Day 1 on site — 5 items
- During each stage — 5 items
- Pre-handover — 4 items
- Handover + post-job — 5 items
Printed on A4. Designed to be ticked off as you go and signed at the bottom by the customer for handover-pack inclusion.
PDFを入手
メールアドレスを入力すれば、すぐにダウンロードが始まります。CMAの新しいテンプレートやツールについても随時お知らせします。
CMAの最新情報を受け取る
業者向けのヒント、製品更新情報、実用的なアイデア。
© 2026 Use CMA. 無断転載を禁じます。
Made by David Wright at Coder Studios